On 16 Oct 2021 Mary and Paul met Scott Johnson to talk about pool property improvements, road and drainage next steps, and options for removing the columns of the 2 story decks. These are the conversation notes.
- The BTA architect was Bob Harris.
- Bob Vanwarden the builder of the pool property & holder of the plans hopefully. 7195894224
- Both E and W berms are plenty high, no need to do a simulation.
- To make a road for the Deluca truck up on berm is pouring some rocks on the sand.
- Managing common space such as the circles is a legal issue not a surveying issue.
- We need a slotted drain for each entrance so water doesn’t come down from the road.
- No problem if we want to replace the large posts for 2 story’s decks with 4×4 metal posts on the corners. We need to do something as the decks themselves are not attached to the townhomes.
- Speak with Ron from Fish and Wildlife about the parking lights, road maintenance, the evacuation route for which Scott isn’t sure exists an easement.
- Concrete pad on NW corner of Filing 2 is from Smitty’s unfinished shed.
- Scott is going to mark the parking lot, road along the 2 stories and pool property. He isn’t sure where the water is. He said the pool walls would be an excellent foundation for a greenhouse.
- Darleen confirmed Filing 2 is part of the BTA, passed on to Mary and Paul plans for Filing 2 which were never started.